← Back to search

The Glebe , Fethard , Co. Tipperary

CONDITIONAL

Planning application 17600033

Tipperary - Tipperary County Council

Proposed Development

development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric (4) the installation of a wastewater treatment unit and polishing filter and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of architectural Heritage) Schedule, ref no. 22110001

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jan 2017

  2. Decision: CONDITIONAL

    9 Mar 2017

  3. Decision due

    16 Mar 2017

  4. Grant issued

    13 Apr 2017

Application Details

Location
The Glebe , Fethard , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.67 ha

Timeline

Registration Date
20 January 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 March 2017
Grant Date
13 April 2017
Permission Expires
12 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
2660390N/A1 May 2026

a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance including landscaping and all associated siteworks & services

Glebe House , Fethard , Co Tipperary

75m
2660475N/A20 May 2026

a) the construction of a stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead; b) to reconfigure existing agricultural vehicle entrance; c) to install underground effluent seepage tank including landscaping and all associated siteworks & services

Glebe House , Fethard , Co. Tipperary

93m
2660458N/A18 May 2026

a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance. c) Install underground effluent seepage tank including landscaping and all associated siteworks & services

Glebe House , Fethard , Co Tipperary

158m
17600035CONDITIONAL20 Jan 2017

development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of Architectural Heritage) Schedule, ref no. 22110001

The Glebe , Gate Lodge , Fethard

264m
2660081CONDITIONAL4 Feb 2026

the constructed extension to the side of the dwelling house, including all associated site development works

Kilknockan Road , Fethard , Co. Tipperary

334m
2660638N/A2 Jul 2026

a dwelling house, entrance driveway, treatment system and all associated site development works

Knockkelly Road , Fethard , Co. Tipperary

458m
17600941UNCONDITIONAL28 Aug 2017

residential development consisting of 59 number two-storey units comprising of a mixture of the following houses types; Type A: two-storey three bed unit of 99 sq.m and Type B: two-storey four bed of 111 sq.m. These house types are varied within proposed blocks of semi-detached and terraced units, Permission is also sought for a new vehicular entrance onto the Cloneen Road, connection to the Local Authority foul and surface water sewers and pubic water mains, together with all associated site development works necessary to facilitate the development. Previous permission 06/302 under clause (A) Section 42 (1A) (a) (V)

Cloneen Road , Fethard , Co Tipperary

473m
2460324CONDITIONAL30 Apr 2024

a) construction of 7 no. single storey terraced houses in two blocks, comprising of 3 no. 1 bed units and 4 no. 2 bed units to accommodate Belmont Park Housing Association CLG service users and carers and b) site development works including new vehicular and pedestrian access from The Back Green, pedestrian access from Gort an Óir, car and bicycle parking, footpaths, bin store, public lighting, landscaping, surface water and foul drainage connections and all associated site boundary works

Gort an Óir & The Back Green , Fethard , Co. Tipperary

479m
211491CONDITIONAL8 Oct 2021

Construction of a dwelling house, garage, entrance, driveway and all associated site works.

The Green , Fethard , Co. Tipperary

493m
2460527CONDITIONAL28 Jun 2024

a construction of 2 no. semi-detached, 3-bedroom, dormer dwelling houses, including all associated site works

Green Street/Upper Green Street , Fethard , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?