Glebe House , Fethard , Co. Tipperary
N/APlanning application 2660475
Tipperary - Tipperary County Council
Proposed Development
a) the construction of a stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead; b) to reconfigure existing agricultural vehicle entrance; c) to install underground effluent seepage tank including landscaping and all associated siteworks & services
View the full application file on the council's planning portal →Application Timeline
Application received
20 May 2026
Further information requested
10 Jul 2026
Application Details
- Location
- Glebe House , Fethard , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.85 ha
Timeline
- Registration Date
- 20 May 2026
- Status
- FURTHER INFORMATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance. c) Install underground effluent seepage tank including landscaping and all associated siteworks & services
Glebe House , Fethard , Co Tipperary
a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance including landscaping and all associated siteworks & services
Glebe House , Fethard , Co Tipperary
development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric (4) the installation of a wastewater treatment unit and polishing filter and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of architectural Heritage) Schedule, ref no. 22110001
The Glebe , Fethard , Co. Tipperary
development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of Architectural Heritage) Schedule, ref no. 22110001
The Glebe , Gate Lodge , Fethard
a dwelling house, entrance driveway, treatment system and all associated site development works
Knockkelly Road , Fethard , Co. Tipperary
the constructed extension to the side of the dwelling house, including all associated site development works
Kilknockan Road , Fethard , Co. Tipperary
a) construction of 7 no. single storey terraced houses in two blocks, comprising of 3 no. 1 bed units and 4 no. 2 bed units to accommodate Belmont Park Housing Association CLG service users and carers and b) site development works including new vehicular and pedestrian access from The Back Green, pedestrian access from Gort an Óir, car and bicycle parking, footpaths, bin store, public lighting, landscaping, surface water and foul drainage connections and all associated site boundary works
Gort an Óir & The Back Green , Fethard , Co. Tipperary
residential development consisting of 59 number two-storey units comprising of a mixture of the following houses types; Type A: two-storey three bed unit of 99 sq.m and Type B: two-storey four bed of 111 sq.m. These house types are varied within proposed blocks of semi-detached and terraced units, Permission is also sought for a new vehicular entrance onto the Cloneen Road, connection to the Local Authority foul and surface water sewers and pubic water mains, together with all associated site development works necessary to facilitate the development. Previous permission 06/302 under clause (A) Section 42 (1A) (a) (V)
Cloneen Road , Fethard , Co Tipperary
Construction of a dwelling house, garage, entrance, driveway and all associated site works.
The Green , Fethard , Co. Tipperary
a construction of 2 no. semi-detached, 3-bedroom, dormer dwelling houses, including all associated site works
Green Street/Upper Green Street , Fethard , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?