← Back to search

The Glebe , Gate Lodge , Fethard

CONDITIONAL

Planning application 17600035

Tipperary - Tipperary County Council

Proposed Development

development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of Architectural Heritage) Schedule, ref no. 22110001

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jan 2017

  2. Decision: CONDITIONAL

    8 Mar 2017

  3. Decision due

    16 Mar 2017

  4. Grant issued

    12 Apr 2017

Application Details

Location
The Glebe , Gate Lodge , Fethard
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.67 ha

Timeline

Registration Date
20 January 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 March 2017
Grant Date
12 April 2017
Permission Expires
11 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

145m
2660081CONDITIONAL4 Feb 2026

the constructed extension to the side of the dwelling house, including all associated site development works

Kilknockan Road , Fethard , Co. Tipperary

158m
17600033CONDITIONAL20 Jan 2017

development comprising (1) removal of later extensions (2) new extensions to the existing dwelling house (3) repairs to existing building fabric (4) the installation of a wastewater treatment unit and polishing filter and all associated ancillary site works, the Fethard Rectory (The Glebe) is a protected structure (RPS Ref S110) and on the NIAH (National Inventory of architectural Heritage) Schedule, ref no. 22110001

The Glebe , Fethard , Co. Tipperary

181m
2660390N/A1 May 2026

a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance including landscaping and all associated siteworks & services

Glebe House , Fethard , Co Tipperary

217m
2660475N/A20 May 2026

a) the construction of a stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead; b) to reconfigure existing agricultural vehicle entrance; c) to install underground effluent seepage tank including landscaping and all associated siteworks & services

Glebe House , Fethard , Co. Tipperary

237m
2660458N/A18 May 2026

a) Construct stable barn consisting of 6 no. stables with feed & tackroom including ancillary horse walker, haybarn & dungstead. b) Reconfigure existing agricultural vehicle entrance. c) Install underground effluent seepage tank including landscaping and all associated siteworks & services

Glebe House , Fethard , Co Tipperary

319m
2460324CONDITIONAL30 Apr 2024

a) construction of 7 no. single storey terraced houses in two blocks, comprising of 3 no. 1 bed units and 4 no. 2 bed units to accommodate Belmont Park Housing Association CLG service users and carers and b) site development works including new vehicular and pedestrian access from The Back Green, pedestrian access from Gort an Óir, car and bicycle parking, footpaths, bin store, public lighting, landscaping, surface water and foul drainage connections and all associated site boundary works

Gort an Óir & The Back Green , Fethard , Co. Tipperary

341m
2460527CONDITIONAL28 Jun 2024

a construction of 2 no. semi-detached, 3-bedroom, dormer dwelling houses, including all associated site works

Green Street/Upper Green Street , Fethard , Co. Tipperary

342m
211491CONDITIONAL8 Oct 2021

Construction of a dwelling house, garage, entrance, driveway and all associated site works.

The Green , Fethard , Co. Tipperary

354m
18600400CONDITIONAL3 Apr 2018

Full planning permission for the following: a) To demolish 3 no dwellings (in ruin) b) To construct a terrace building consisting of 3 no. 2 bed dwelling units with boundary walls c) Permission for 4 no carparking spaces with realigned public footpath and all ancillary works. And connections to existing public services and all associated sitework and ancillary works

Strylea , Fethard , Co. Tipperary

355m
17600941UNCONDITIONAL28 Aug 2017

residential development consisting of 59 number two-storey units comprising of a mixture of the following houses types; Type A: two-storey three bed unit of 99 sq.m and Type B: two-storey four bed of 111 sq.m. These house types are varied within proposed blocks of semi-detached and terraced units, Permission is also sought for a new vehicular entrance onto the Cloneen Road, connection to the Local Authority foul and surface water sewers and pubic water mains, together with all associated site development works necessary to facilitate the development. Previous permission 06/302 under clause (A) Section 42 (1A) (a) (V)

Cloneen Road , Fethard , Co Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?