Nenagh North , Nenagh , Co. Tipperary
N/APlanning application 2460771
Tipperary - Tipperary County Council
Proposed Development
the construction of a new commercial vehicle test centre with inspection pit, ancillary office, waiting area, toilets & connection to existing mains sewer & surface water services and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
13 Sept 2024
Further information requested
1 Nov 2024
Application withdrawn
9 May 2025
Application Details
- Location
- Nenagh North , Nenagh , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.524 ha
Timeline
- Registration Date
- 13 September 2024
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the use of the first-floor area of its existing Club House as a; 1) sports exercise and gym work outs 2) reception area for club functions 3) meeting room and all ancillary site works
Nenagh Athletic Football Club Grounds , Old Birr Road , Nenagh Co Tipperary
installation of a 24m monopole type telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works and pedestrian access steps on the grounds of Nenagh AFC
Nenagh AFC Bulfin Road , Nenagh North Nenagh , Co. Tipperary
to renovate and extend dwelling along with all ancillary site works
23 Bulfin Cresent , Nenagh , Co. Tipperary
pedestrian access gate from site boundary onto Bulfin Road
No. 9 Derrylavin Heights , Nenagh , Co. Tipperary
for pedestrian access gate from site boundary at No 9 Derrylavin Heights onto Bulfin Road, Nenagh
No 9 Derrylavin Heights , Nenagh , Co Tipperary
domestic extension at rear of dwelling and PERMISSION to erect new domestic extension to same dwelling
Old Birr Road , Nenagh , Co. Tipperary
a) construction of a commercial storage yard; b) retention of associated boundary walls within the curtilage of said yard; c) retention of placement of a portable cabin within the yard; and d.) PERMISSION for future construction of an open roofed structure within the yard
Bulfin Road , Nenagh , Co Tipperary
removal of the existing brick wall, create two car parking spaces, construct a driveway, and drop down the kerb on the public pavement
No. 5 Bulfin Crescent , Nenagh , Co. Tipperary
removal of the existing brick wall, create two car parking spaces, construct a driveway, and drop down the kerb on the public pavement
No. 5 Bulfin Crescent , Nenagh , Co. Tipperary
construction of dry goods store and associated site works
Old Birr Road , Nenagh , Co Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?