← Back to search

Bulfin Road , Nenagh , Co Tipperary

CONDITIONAL

Planning application 2587

Tipperary - Tipperary County Council

Proposed Development

a) construction of a commercial storage yard; b) retention of associated boundary walls within the curtilage of said yard; c) retention of placement of a portable cabin within the yard; and d.) PERMISSION for future construction of an open roofed structure within the yard

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 May 2025

  2. Further information requested

    9 Jul 2025

  3. Further information received

    19 Jan 2026

  4. Decision: CONDITIONAL

    10 Mar 2026

  5. Decision due

    15 Mar 2026

  6. Grant issued

    13 Apr 2026

Application Details

Location
Bulfin Road , Nenagh , Co Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.049 ha

Timeline

Registration Date
26 May 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 March 2026
Grant Date
13 April 2026
Permission Expires
12 April 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
2334CONDITIONAL13 Feb 2023

domestic extension at rear of dwelling and PERMISSION to erect new domestic extension to same dwelling

Old Birr Road , Nenagh , Co. Tipperary

44m
258CONDITIONAL22 Jan 2025

as-constructed single storey extension to the rear of Friary Ironworks

Unit 1 Riverstown Industrial Park , Old Birr Road , Nenagh Co. Tipperary

45m
21822N/A8 Jun 2021

construction of dry goods store and associated site works

Old Birr Road , Nenagh , Co Tipperary

56m
21949N/A1 Jul 2021

construction of dry goods store and associated site works

Old Birr Road , Nenagh , Co Tipperary

56m
18601090CONDITIONAL7 Sept 2018

existing building for commercial purposes

Old Birr Road , Nenagh , Co. Tipperary

64m
20716CONDITIONAL7 Jul 2020

for pedestrian access gate from site boundary at No 9 Derrylavin Heights onto Bulfin Road, Nenagh

No 9 Derrylavin Heights , Nenagh , Co Tipperary

64m
20625N/A18 Jun 2020

pedestrian access gate from site boundary onto Bulfin Road

No. 9 Derrylavin Heights , Nenagh , Co. Tipperary

128m
2460771N/A13 Sept 2024

the construction of a new commercial vehicle test centre with inspection pit, ancillary office, waiting area, toilets & connection to existing mains sewer & surface water services and all associated site works

Nenagh North , Nenagh , Co. Tipperary

148m
2460961N/A8 Nov 2024

an upgrade to the existing Nenagh wastewater treatment plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh river to the immediate east of the site. The proposed development will comprise of proposed construction of: dual inlet pumping station; storm overflow chamber complete with overflow screens; 2 no. storm tanks including storm return pumps and tank cleaning systems; preliminary treatment stream comprising: fine screens complete with screenings handling systems; grit removal system complete with fat, oil and grease removal; grit handling system and fat, oil and grease storage tank; sludge process stream comprising: sludge import station complete with ancillary equipment; waste activated sludge buffer tank complete with ancillary equipment; picket fence thickeners complete with ancillary equipment; thickened sludge tanks complete with transfer pumps; sludge dewatering system complete with outdoor sludge skips; polymer make-up and dosing plant; return liquors pumping station; sequencing batch reactor tanks and blowers with distribution chamber; ferric sulphate dosing plant; tertiary treatment disk filter and wastewater pumping station; 2 no. odour control units with additional passive odour units; new ESB MV substation complete with outdoor generator and bunded fuel storage tanks; new control panel kiosks; upgrade of outfall headwall to Nenagh river; site lighting; flood defence walls to existing buildings and flood compensation areas; revised site entrance including lay-by area and palisade fencing and flow measurement and sampling chambers. Proposed re-purposing of existing structures as follows: conversion of existing picket fence thickener to a sludge import pumping station; conversion of existing final settlement tank to a final effluent buffer tank; conversion of existing final settlement tank to a surface water attenuation tank; diversion of existing northern catchment gravity main to proposed inlet pumping station and diversion of existing southern catchment rising main to proposed inlet pumping station. Demolition of the following: existing (northern and southern) oxidation ditches to be demolished and partially filled in; existing return activated sludge lifting wheel arrangement; existing waste activated system pumping station; existing belt thickeners and poly plant; existing inlet works; existing flow splitti

The existing Wastewater Treatment Plant , Bulfin Road , Nenagh in the townland of Nenagh North

148m
2461086CONDITIONAL12 Dec 2024

an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken

The existing Wastewater Treatment Plant , Bulfin Road , Nenagh in the townland of Nenagh North

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?