Kyleballygalvan , The Commons , Thurles Co. Tipperary

CONDITIONAL

Planning application 2461050

Tipperary - Tipperary County Council

Proposed Development

a single storey dwelling house, septic tank and percolation area, private bored well, new entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Dec 2024

  2. Decision: CONDITIONAL

    6 Feb 2025

  3. Decision due

    8 Feb 2025

  4. Grant issued

    12 Mar 2025

Application Details

Location
Kyleballygalvan , The Commons , Thurles Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.33 ha
Floor Area
172.7 sq m
Residential Units
1

Timeline

Registration Date
6 December 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 February 2025
Grant Date
12 March 2025
Permission Expires
11 March 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

57m
19601350CONDITIONAL3 Dec 2019

alterations to existing entrance including associated site works

Kyleballygalvan , The Commons , Thurles

101m
18600548CONDITIONAL2 May 2018

to demolish existing farm buildings on site, build a 1.5 storey dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works

Kyleballygalvan , The Commons , Thurles

426m
22618CONDITIONAL28 Oct 2022

a pedestrian walkway and lighting including assoicated site works

Kyle , The Commons , Thurles

426m
2660148CONDITIONAL23 Feb 2026

synthetic Astro-Turf training pitch, associated flood lighting and perimeter steel fencing, ball catch netting, Hurling ball wall, all associated site works to facilitate this development

Kyleballygalvan Bolintlea , Ballingarry , Co. Tipperary

487m
2561299N/A15 Dec 2025

the construction of synthetic astro-turf training pitch, associated flood lighting and perimeter steel fencing, ball catch netting, hurling ball wall and all associated site works to facilitate this development

Kyleballygalvan , Ballingarry , Co. Tipperary

677m
2360845CONDITIONAL20 Oct 2023

the construction of a two storey dwelling and domestic garage, wastewater treatment system and raised bed soil polishing filter and all associated site works

Gortnasmuttaun , Ballingarry , Thurles

1.0km
2681N/A30 Jun 2026

a history mural depicting an image of William Smith O'Brien and his letter praising and supporting the miners of The Commons in 1984. Mural to be placed on right hand side of front of building

Old School Building , The Commons , Ballingarry

1.3km
2260696CONDITIONAL14 Dec 2022

a temporary Meteorological Mast and associated site works that will operate for a further 3 years, it will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment

Farranrory Upper , Ballingarry , Co Tipperary

1.4km
2260554N/A13 Oct 2022

a temporary Meteorological Mast and associated site works that will operate for a further 3 years. The Meteorological Mast will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment

Farranrory Upper , BALLINGARRY , Co Tipperary

1.5km
20972CONDITIONAL1 Sept 2020

a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun , Co. Tipperary