← Back to search

Thomastown North , Golden , Co. Tipperary

CONDITIONAL

Planning application 2560023

Tipperary - Tipperary County Council

Proposed Development

extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Jan 2025

  2. Decision: CONDITIONAL

    10 Mar 2025

  3. Decision due

    12 Mar 2025

  4. Grant issued

    13 Apr 2025

Application Details

Location
Thomastown North , Golden , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.074 ha

Timeline

Registration Date
16 January 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 March 2025
Grant Date
13 April 2025
Permission Expires
12 April 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

33m
2660024CONDITIONAL15 Jan 2026

extension and renovation of existing dwelling, permission to retain extension to rear of dwelling, permission to construct new domestic garage, permission to decommission existing septic tank and install new waste water treatment system and percolation area and associated site works

Thomastown North , Golden , Co. Tipperary

63m
17601440N/A22 Dec 2017

Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.

Ballymacady , Golden , Co. Tipperary

63m
18600170CONDITIONAL13 Feb 2018

Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.

Ballymacady , Golden , Co. Tipperary

84m
17600933N/A25 Aug 2017

a two storey dwelling, garage, septic tank, boundaries, site entrance and all associated site works

Ballymacady , Golden , Co. Tipperary

319m
2260197CONDITIONAL30 Apr 2022

existing detached garage as built

Thomastown Demesne North , Golden , Co Tipperary

339m
17600559N/A18 May 2017

the construction of a two storey dwelling, garage, septic tank, peroclation area, site entrance, site boundaries and all associated site works

Ballymacady , Golden , Co. Tipperary

1.1km
2660469CONDITIONAL19 May 2026

RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Rathduff , Townland of Thomastown Demesne South , Co. Tipperary

1.1km
211014CONDITIONAL13 Jul 2021

a period of 5 years to construct and complete a Solar PV Energy Development with a total site area of 42.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The development would be operational for 35 years

Rathduff , Thomastown Demesne South , Co. Tipperary

1.1km
20506N/A25 May 2020

a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years

Rathduff , Thomastown , Co. Tipperary

1.2km
20103N/A6 Feb 2020

a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years

Rathduff , Thomastown , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?