Thomastown North , Golden , Co. Tipperary
CONDITIONALPlanning application 2560023
Tipperary - Tipperary County Council
Proposed Development
extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jan 2025
Decision: CONDITIONAL
10 Mar 2025
Decision due
12 Mar 2025
Grant issued
13 Apr 2025
Application Details
- Location
- Thomastown North , Golden , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.074 ha
Timeline
- Registration Date
- 16 January 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 March 2025
- Grant Date
- 13 April 2025
- Permission Expires
- 12 April 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
extension and renovation of existing dwelling, permission to retain extension to rear of dwelling, permission to construct new domestic garage, permission to decommission existing septic tank and install new waste water treatment system and percolation area and associated site works
Thomastown North , Golden , Co. Tipperary
Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.
Ballymacady , Golden , Co. Tipperary
Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works.
Ballymacady , Golden , Co. Tipperary
a two storey dwelling, garage, septic tank, boundaries, site entrance and all associated site works
Ballymacady , Golden , Co. Tipperary
existing detached garage as built
Thomastown Demesne North , Golden , Co Tipperary
the construction of a two storey dwelling, garage, septic tank, peroclation area, site entrance, site boundaries and all associated site works
Ballymacady , Golden , Co. Tipperary
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Rathduff , Townland of Thomastown Demesne South , Co. Tipperary
a period of 5 years to construct and complete a Solar PV Energy Development with a total site area of 42.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The development would be operational for 35 years
Rathduff , Thomastown Demesne South , Co. Tipperary
a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years
Rathduff , Thomastown , Co. Tipperary
a period of 5 years to construct and complete a Solar PV Energy Development with a total site of 43.68 hectares, to include a single storey electrical substation building, electrical transformer and inverter substation modules, solar PV panels, ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years
Rathduff , Thomastown , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?