← Back to search

St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary

N/A

Planning application 2660079

Tipperary - Tipperary County Council

Proposed Development

change of use from residential (former CBS brothers residence) to assembly & recreation (educational) & related works

View the full application file on the council's planning portal →

Application Details

Location
St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
7.25 ha

Timeline

Registration Date
3 February 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

70m
2660126CONDITIONAL16 Feb 2026

change of use from residential use (former CBS brothers residence and ancillary garage) to assembly & recreation use (educational, including proposed changing rooms to existing garage), proposed external fire stairs & related elevational changes and works

St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary

70m
2660219CONDITIONAL10 Mar 2026

an all-weather training pitch with 5 metre high precast concrete ball wall, perimeter fencing, 6 no. 12 metre high columns and floodlights and all associated site works

St. Josephs CBS Primary School , Summerhill Nenagh , Co. Tipperary

75m
2260620CONDITIONAL15 Nov 2022

a single storey extension to the north western side of the existing house to include bedroom, wc area, utility room and ancillary site works

26 Hawthorns , Summerhill , Nenagh Co. Tipperary

97m
18600142CONDITIONAL8 Feb 2018

a single-storey extension to existing school and all related site works

St Josephs CBS , Summerhill , Nenagh

197m
19600977CONDITIONAL4 Sept 2019

(a) proposed new single storey extension to existing school building (b) minor alterations to the existing school building & all associated site works

Summerhill , Nenagh , Co. Tipperary

200m
21758CONDITIONAL26 May 2021

standalone prefabricated building and enclosed outside play area and PERMISSION to use the building as a Community Childcare Facility and Permission for ancillary site works including the provision of a ramp and access footpaths

CBS Primary School , Summerhill , Nenagh Co. Tipperary

222m
2260274CONDITIONAL4 Jun 2022

the existing first floor extension including dormer roof and windows as constructed to the rear of the dwelling

No. 5 Casement Terrace , Dublin Road , Nenagh Co. Tipperary

246m
2360612CONDITIONAL10 Aug 2023

advertising signage on the gable wall of existing property and PERMISSION is also being sought to demolish the single storey rear annex to the rear of the property which is part of existing Veterinary Clinic and to construct a new part single storey part two storey replacement extension to the rear of the property for use as an extension to the existing Veterinary Clinic, enlarge the existing site by incorporating part of rear garden of adjoining premises, provision of additional carparking, connection to existing mains services together with all associated site works

26 & 25 Summerhill , Nenagh , Co. Tipperary

248m
2360607CONDITIONAL9 Aug 2023

a) alterations to front boundary wall of existing property & b) the partial construction of an extension to the rear of the existing property. Planning permission is also being sought to complete the partially constructed extension to the rear of the property together with all associated site works

27 Summerhill , Nenagh , Co. Tipperary

260m
24142N/A27 Jun 2024

the erection of metal traffic bollards (number 40 approx) at (i) the kerb side of the former Military Barracks where it adjoins the public footpath (ii) either side of the entrance to property delineating the property boundary and the right of way -the bollards will be approx 1 metre in height above the ground level and spaced approx 1.5 mere apart

The Former Military Barracks , Summerhill , Nenagh

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?