St. Josephs CBS Primary School , Summerhill Nenagh , Co. Tipperary
CONDITIONALPlanning application 2660219
Tipperary - Tipperary County Council
Proposed Development
an all-weather training pitch with 5 metre high precast concrete ball wall, perimeter fencing, 6 no. 12 metre high columns and floodlights and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
10 Mar 2026
Further information requested
23 Apr 2026
Further information received
18 May 2026
Decision: CONDITIONAL
11 Jun 2026
Decision due
14 Jun 2026
Grant issued
15 Jul 2026
Application Details
- Location
- St. Josephs CBS Primary School , Summerhill Nenagh , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 7.28 ha
Timeline
- Registration Date
- 10 March 2026
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 June 2026
- Grant Date
- 15 July 2026
- Permission Expires
- 14 July 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
change of use from residential use (former CBS brothers residence and ancillary garage) to assembly & recreation use (educational, including proposed changing rooms to existing garage), proposed external fire stairs & related elevational changes and works
St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary
change of use from residential (former CBS brothers residence) to assembly & recreation (educational) & related works
St. Joseph’s CBS Secondary School , Summerhill Nenagh , Co. Tipperary
a single-storey extension to existing school and all related site works
St Josephs CBS , Summerhill , Nenagh
a single storey extension to the north western side of the existing house to include bedroom, wc area, utility room and ancillary site works
26 Hawthorns , Summerhill , Nenagh Co. Tipperary
the existing first floor extension including dormer roof and windows as constructed to the rear of the dwelling
No. 5 Casement Terrace , Dublin Road , Nenagh Co. Tipperary
(a) proposed new single storey extension to existing school building (b) minor alterations to the existing school building & all associated site works
Summerhill , Nenagh , Co. Tipperary
standalone prefabricated building and enclosed outside play area and PERMISSION to use the building as a Community Childcare Facility and Permission for ancillary site works including the provision of a ramp and access footpaths
CBS Primary School , Summerhill , Nenagh Co. Tipperary
one single storey free standing prefabricated building and associated external access steps and a ramp, within the grounds of the hotel, for the purposes of offering computed based examinations services to the public
The Great National Abbey Court Hotel , Dublin Road , Nenagh
extension to rear of dwelling
6 Thomas McDonagh Street , Nenagh , Co. Tipperary
1. Solar PV panels to the existing hotel roof 2. Two new wind turbines, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works
Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?