← Planning Wire · Wicklow County Council news

Solar farmsLodgedWicklow

1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow

5 October 2026 · Permission.ie Planning Wire · from the Wicklow County Council planning register · published 17 November 2026

An applicant lodged plans with Wicklow County Council on 5 October 2026 for a 1.1-hectare solar farm at Ballinaskea House, Ballinaskea. The application seeks the accelerated RED III consenting route for renewables.

Key facts

Reference
2660892
Planning authority
Wicklow County Council
Location
Ballinaskea House, Ballinaskea, Arklow
Received
5 October 2026
Application type
PERMISSION
Site area
1.1 hectares
Status
INCOMPLETED APPLICATION
Submissions until
8 November 2026 (closed)

In context

It is one of 12 solar farm applications Wicklow County Council has received in the past twelve months, against 337 nationally. Of the 558 such applications decided by councils in the past three years, 92% were granted.

What happens next

The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.

The development description, as lodged

Verbatim from the Wicklow County Council register. This is the source for every figure in the story above.

RED III - (1) installation of a 227 sqm domestic ground-mounted solar photovoltaic (PV) panel system on steel support frames (2) erection of a domestic battery energy storage enclosure shed (3) all associated underground electrical cabling and PVC ducting (4) installation of the new site access gates with a gravel-surfaced front apron and additional wire boundary fencing (5) the removal of an existing Laurel hedge located to the north of the existing field entrance, and its replacement with a new Laurel hedge planted in a set-back position from the public road tarmac to maintain natural screening (6) the creation of an additional grass verge width to the north of the existing field entrance to improve visibility lines; and (7) all associated site development, drainage, and landscaping works

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow", 5 October 2026. https://www.permission.ie/news/wicklow-county-council/2660892

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/wicklow-county-council/2660892">1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow</a>, Permission.ie analysis of the national planning register, 5 October 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2660892.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Wicklow the week it appears.

Set up alerts