Solar farmsLodgedWicklow
1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow
5 October 2026 · Permission.ie Planning Wire · from the Wicklow County Council planning register · published 17 November 2026
An applicant lodged plans with Wicklow County Council on 5 October 2026 for a 1.1-hectare solar farm at Ballinaskea House, Ballinaskea. The application seeks the accelerated RED III consenting route for renewables.
Key facts
- Reference
- 2660892
- Planning authority
- Wicklow County Council
- Location
- Ballinaskea House, Ballinaskea, Arklow
- Received
- 5 October 2026
- Application type
- PERMISSION
- Site area
- 1.1 hectares
- Status
- INCOMPLETED APPLICATION
- Submissions until
- 8 November 2026 (closed)
In context
It is one of 12 solar farm applications Wicklow County Council has received in the past twelve months, against 337 nationally. Of the 558 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Wicklow County Council register. This is the source for every figure in the story above.
RED III - (1) installation of a 227 sqm domestic ground-mounted solar photovoltaic (PV) panel system on steel support frames (2) erection of a domestic battery energy storage enclosure shed (3) all associated underground electrical cabling and PVC ducting (4) installation of the new site access gates with a gravel-surfaced front apron and additional wire boundary fencing (5) the removal of an existing Laurel hedge located to the north of the existing field entrance, and its replacement with a new Laurel hedge planted in a set-back position from the public road tarmac to maintain natural screening (6) the creation of an additional grass verge width to the north of the existing field entrance to improve visibility lines; and (7) all associated site development, drainage, and landscaping works
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow", 5 October 2026. https://www.permission.ie/news/wicklow-county-council/2660892
<p>Source: <a href="https://www.permission.ie/news/wicklow-county-council/2660892">1.1-hectare solar farm proposed at Ballinaskea House, Ballinaskea, Co. Wicklow</a>, Permission.ie analysis of the national planning register, 5 October 2026.</p>
Map, site boundary, timeline and nearby applications for 2660892.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Wicklow the week it appears.
Set up alerts