Tullagreen Carrigtwohill

INCOMPLETED APPLICATION

Planning application 04/8746

Cork - Cork County Council

Proposed Development

Construction of first floor mezzanine within industrial unit

View the full application file on the council's planning portal →

Application Details

Location
Tullagreen Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
29 November 2004
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
04/235CONDITIONAL21 Jan 2004

Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles

Tullagreen Carrigtwohill

16m
16/5697CONDITIONAL7 Jul 2016

Construction of a new offices and canteen extension and associated site works. The application relates to an establishment which holds an integrated pollution prevention and control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

26m
23/5901CONDITIONAL20 Sept 2023

Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.

Tullagreen Carrigtwohill Co. Cork T45KD29

35m
14/4013CONDITIONAL6 Jan 2014

[1] Change of use from warehousing to manufacturing with total floor area of 330sqm. [2] Construction of a new chemical store with IBC bunded racking, new floor slab and associated works. [3] Construction of new small volume chemical store and associated site works.

Tullagreen Carrigtwohill

38m
22/4839CONDITIONAL14 Apr 2022

The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis

Tullagreen and Carrigtohill (townland) Carrigtwohill Co.Cork

39m
23/5589INCOMPLETED APPLICATION3 Aug 2023

Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building

Tullagreen Carrigtohill Co.Cork

40m
13/5232CONDITIONAL27 Jun 2013

Construction of a boiler house including boiler stack and associated site works

Tullagreen Carrigtohill Co.Cork

40m
13/5147INCOMPLETED APPLICATION18 Jun 2013

Construction of a boiler house including boiler stack and associated site works at Tullagreen Townland, Carrigtohill. The proposed development is covered by an existing integrated pollution prevention and control licence no. P0571-03. The development refers to a modification to an establishment to which the major accident directive applies.

Tullagreen Carrigtohill Co Cork

40m
14/4457CONDITIONAL6 Mar 2014

Construction of a utilities building with associated site works

Tullagreen Carrigtwohill

40m
23/4096CONDITIONAL26 Jan 2023

Permission for retention of an emergency response team modular building, a medical team modular building, an engineering support office modular building, a chemical storage unit, an argon gas store, joining and enclosing of two chemical drum store canopies, a contractor’s smoking shelter, a general smoking shelter, a motorbike and bicycle shelter, a chemical dosing station enclosure, a water analysing cabin, increase height of the stairwell enclosure to the northwest of the K2 production building and enclosure to the stairs on the north east of the K2 production building which are alterations to that granted under planning permission number 18/6189, permanent security building and facilities support building temporarily granted under planning permission 13/4033, production building elevational alterations to that granted under planning permission number 14/4013, machinery parts storage building elevational and layout alterations and additional mezzanine storage area, as constructed, to that granted under planning permission number 15/6112, boiler house elevational and layout alterations and additional mezzanine maintenance area, as constructed, to that granted under planning permission number 13/5232, retention and completion of three IC4 engineering support office modular buildings and link corridor joining the engineering support office to the IC4 engineering support office #1, and all associated site works at the existing facility at Tullagreen and Carrigtohill (townland), Carrigtowhill, Co.Cork, T45 KD29. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.

Tullagreen & Carrigtohill Td. Carrigtwohill Co.Cork

The submission window has closed

Observations on this application closed on Tuesday 11 January 2005, five weeks after it was received. The authority cannot accept a late submission.