Tullagreen Carrigtwohill Co. Cork T45KD29
CONDITIONALPlanning application 23/5901
Cork - Cork County Council
Proposed Development
Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.
Application Timeline
Application received
20 Sept 2023
Decision due
14 Nov 2023
Decision: CONDITIONAL
14 Nov 2023
Grant issued
18 Dec 2023
Application Details
- Location
- Tullagreen Carrigtwohill Co. Cork T45KD29
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 September 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 November 2023
- Grant Date
- 18 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
[1] Change of use from warehousing to manufacturing with total floor area of 330sqm. [2] Construction of a new chemical store with IBC bunded racking, new floor slab and associated works. [3] Construction of new small volume chemical store and associated site works.
Tullagreen Carrigtwohill
Construction of first floor mezzanine within industrial unit
Tullagreen Carrigtwohill
Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles
Tullagreen Carrigtwohill
Construction of a new offices and canteen extension and associated site works. The application relates to an establishment which holds an integrated pollution prevention and control (IPPC) licence and to which the Major Accident Regulations apply.
Tullagreen Carrigtohill Co. Cork
First Floor mezzanine within the existing warehouse, change of use from warehouse to a ground floor production area & construction of external solvent store building, external acid & caustic storage bund
Tullagreen Carrigtwohill
Construction of first floor mezzanine production area within the existing warehouse, partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid & caustic storage bund & associated works
Tullagreen Carrigtwohill
Construction of new first floor mezzanine production area within the existing warehouse and partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid and caustic storage bund and associated works
Tullagreen Carrigtwohill
The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis
Tullagreen and Carrigtohill (townland) Carrigtwohill Co.Cork
Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building
Tullagreen Carrigtohill Co.Cork
Construction of a boiler house including boiler stack and associated site works
Tullagreen Carrigtohill Co.Cork