← Back to search

Tullagreen Carrigtwohill

CONDITIONAL

Planning application 09/4208

Cork - Cork County Council

Proposed Development

Construction of new first floor mezzanine production area within the existing warehouse and partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid and caustic storage bund and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Jan 2009

  2. Decision due

    23 Mar 2009

  3. Decision: CONDITIONAL

    23 Mar 2009

  4. Grant issued

    23 Apr 2009

Application Details

Location
Tullagreen Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
27 January 2009
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 March 2009
Grant Date
23 April 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
09/4008INCOMPLETED APPLICATION7 Jan 2009

Construction of first floor mezzanine production area within the existing warehouse, partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid & caustic storage bund & associated works

Tullagreen Carrigtwohill

10m
08/10145INCOMPLETED APPLICATION16 Dec 2008

First Floor mezzanine within the existing warehouse, change of use from warehouse to a ground floor production area & construction of external solvent store building, external acid & caustic storage bund

Tullagreen Carrigtwohill

37m
14/4013CONDITIONAL6 Jan 2014

[1] Change of use from warehousing to manufacturing with total floor area of 330sqm. [2] Construction of a new chemical store with IBC bunded racking, new floor slab and associated works. [3] Construction of new small volume chemical store and associated site works.

Tullagreen Carrigtwohill

48m
23/5901CONDITIONAL20 Sept 2023

Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.

Tullagreen Carrigtwohill Co. Cork T45KD29

49m
04/8746INCOMPLETED APPLICATION29 Nov 2004

Construction of first floor mezzanine within industrial unit

Tullagreen Carrigtwohill

49m
04/235CONDITIONAL21 Jan 2004

Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles

Tullagreen Carrigtwohill

62m
16/6675CONDITIONAL26 Oct 2016

The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

62m
16/6498INCOMPLETED APPLICATION7 Oct 2016

The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

62m
23/5589INCOMPLETED APPLICATION3 Aug 2023

Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building

Tullagreen Carrigtohill Co.Cork

63m
13/4033CONDITIONAL11 Jan 2013

Retention of an extension to the casting hall, utility boiler area and toilet block, administration waste area and balcony, waste water treatment de-sludging building, east side stairwell, south side stairwell, mixing room extension, drum store building location, roll store no. 1extension, roll store no. 2 extension, security building, facility cabin, lab offices, smoking shelter and associated works

Tullagreen Carrigtohill