Proposed Development
Construction of new first floor mezzanine production area within the existing warehouse and partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid and caustic storage bund and associated works
Application Timeline
Application received
27 Jan 2009
Decision due
23 Mar 2009
Decision: CONDITIONAL
23 Mar 2009
Grant issued
23 Apr 2009
Application Details
- Location
- Tullagreen Carrigtwohill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 27 January 2009
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 March 2009
- Grant Date
- 23 April 2009
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of first floor mezzanine production area within the existing warehouse, partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid & caustic storage bund & associated works
Tullagreen Carrigtwohill
First Floor mezzanine within the existing warehouse, change of use from warehouse to a ground floor production area & construction of external solvent store building, external acid & caustic storage bund
Tullagreen Carrigtwohill
[1] Change of use from warehousing to manufacturing with total floor area of 330sqm. [2] Construction of a new chemical store with IBC bunded racking, new floor slab and associated works. [3] Construction of new small volume chemical store and associated site works.
Tullagreen Carrigtwohill
Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.
Tullagreen Carrigtwohill Co. Cork T45KD29
Construction of first floor mezzanine within industrial unit
Tullagreen Carrigtwohill
Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles
Tullagreen Carrigtwohill
The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.
Tullagreen Carrigtohill Co. Cork
The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.
Tullagreen Carrigtohill Co. Cork
Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building
Tullagreen Carrigtohill Co.Cork
Retention of an extension to the casting hall, utility boiler area and toilet block, administration waste area and balcony, waste water treatment de-sludging building, east side stairwell, south side stairwell, mixing room extension, drum store building location, roll store no. 1extension, roll store no. 2 extension, security building, facility cabin, lab offices, smoking shelter and associated works
Tullagreen Carrigtohill
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?