← Back to search

Tullagreen Carrigtwohill

CONDITIONAL

Planning application 14/4013

Cork - Cork County Council

Proposed Development

[1] Change of use from warehousing to manufacturing with total floor area of 330sqm. [2] Construction of a new chemical store with IBC bunded racking, new floor slab and associated works. [3] Construction of new small volume chemical store and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Jan 2014

  2. Decision: CONDITIONAL

    27 Feb 2014

  3. Decision due

    3 Mar 2014

  4. Grant issued

    4 Apr 2014

Application Details

Location
Tullagreen Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 January 2014
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 February 2014
Grant Date
4 April 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
23/5901CONDITIONAL20 Sept 2023

Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.

Tullagreen Carrigtwohill Co. Cork T45KD29

28m
08/10145INCOMPLETED APPLICATION16 Dec 2008

First Floor mezzanine within the existing warehouse, change of use from warehouse to a ground floor production area & construction of external solvent store building, external acid & caustic storage bund

Tullagreen Carrigtwohill

30m
09/4008INCOMPLETED APPLICATION7 Jan 2009

Construction of first floor mezzanine production area within the existing warehouse, partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid & caustic storage bund & associated works

Tullagreen Carrigtwohill

35m
04/8746INCOMPLETED APPLICATION29 Nov 2004

Construction of first floor mezzanine within industrial unit

Tullagreen Carrigtwohill

35m
04/235CONDITIONAL21 Jan 2004

Construction of a internal first floor over part of production area in factory for use as laboratory and plantroom with staircase and lift access and external wall grilles

Tullagreen Carrigtwohill

37m
09/4208CONDITIONAL27 Jan 2009

Construction of new first floor mezzanine production area within the existing warehouse and partial change of use of ground floor of warehouse to production area and construction of external solvent store building, external acid and caustic storage bund and associated works

Tullagreen Carrigtwohill

44m
16/5697CONDITIONAL7 Jul 2016

Construction of a new offices and canteen extension and associated site works. The application relates to an establishment which holds an integrated pollution prevention and control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

55m
16/6675CONDITIONAL26 Oct 2016

The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

55m
16/6498INCOMPLETED APPLICATION7 Oct 2016

The construction of a raised roof area and associated roof mounted plant above an existing production area, and associated site works. The application relates to an establishment which holds an Integrated Pollution Prevention and Control (IPPC) licence and to which the Major Accident Regulations apply.

Tullagreen Carrigtohill Co. Cork

68m
22/4839CONDITIONAL14 Apr 2022

The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis

Tullagreen and Carrigtohill (townland) Carrigtwohill Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?