Little Island Business Park Ballytrasna Little Island Co. Cork
CONDITIONALPlanning application 18/5047
Cork - Cork County Council
Proposed Development
Demolition of the existing Reagecon building including crushing concrete on site and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
27 Apr 2018
Decision: CONDITIONAL
22 Aug 2018
Decision due
23 Aug 2018
Grant issued
27 Sept 2018
Application Details
- Location
- Little Island Business Park Ballytrasna Little Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 27 April 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 August 2018
- Grant Date
- 27 September 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of an existing industrial unit at north/west corner of site at Little Island Business Park and replacment of same with a surface level car park
Ballytrasna Little Island
The development will consist of the construction of a new plant room adjacent to the existing production building, comprising of a two storey steel frame with the steel cladding on the upper section. New floor area to be 143sq.m with an overall height not exceeding 10.513m
PepsiCo Worldwide Flavors Production Plant Little Island Industrial Estate, Ballytrasna Little Island Co. Cork
Construction of a new plant room adjacent to the existing production building, comprising of a two storey steel frame with the steel cladding on the upper section. New floor area to be 143sq.m with an overall height not exceeding 10.513m
PepsiCo Worldwide Flavors Production Little Island Industrial Estate Ballytrasna Little Island
Dust extraction building as lean-to extension to rear of factory
UNIT 25W, LITTLE ISLAND IND. EST., BALLYTRASNA,
Construction of steel framed sheeted building to enclose storage tank and plant
UNIT 25W, LITTLE ISLAND IND. EST., BALLYTRASNA,
Relocation of process water treatment room to new purpose built building
Ballytrasna Little Island
An extension to the existing production building, expansion of the site utility services, and provision of a new waste water treatment plant at this site. The proposed development will comprise of: (i) a three storey 1,723 sqm extension to a maximum height of 21.145m, including roof mounted equipment, to the north-west side of the existing single storey production building (maximum height of 9.35m), (ii) expansion of the utility yard to the west and north of the extension which will include; a chilled water system and buffer tanks, a clean-in-place system, a bunded diesel storage tank, a diesel generator and associated flue, a new boiler flue, a juice unloading bund, a 24 sqm single storey extension to the sprinkler pump house, and associated equipment access platforms and pipe racks (iii) a 118 sqm single storey chemical drum store lean-to enclosure (iv) a new waste water treatment plant, which will include c.1,856 sqm area of bunded tanks, a 165sqm single storey control building, a 64 sqm single storey electrical substation building, and a reconfigured access from the public road (v) the decommissioning and relocation of 40 No. existing car parking spaces from the existing R&D facility to a proposed extension to the car park (under construction) permitted under planning application reference 19/06776, and the addition of 13 No. new parking spaces (vi) temporary contractor’s compound, and (vii) all associated underground services, site development works and landscaping. The proposed development will also include the demolition and removal of redundant structures and equipment and the decommissioning of the existing waste water treatment plant. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application.
Ballytrasna Little Island Co. Cork
Demolition of an existing warehouse building and construction of a new building for the expansion of R & D Facility and carpark area, construction of a new substation and all associated site works
Ballytrasna Little Island
The demolition of an existing warehouse building and construction of a new building for expansion of their R&D Facility and car parking area, construction of a new substation, boiler house, covered bin store, MCC room, external air handling unit and all associated site works
Ballytrasna Little Island Co. Cork
Construct extensions to the front and rear of existing commercial premises and Permission for Retention of first floor mezzanine area.
Little Island Industrial Estate Ballytrasna Td., Little Island Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?