Proposed Development
The demolition of an existing dwelling and the construction of an industrial production building (3157 sq.m) complete with canteen, toilet and first aid facilities, electrical switch room and office space, solar panels on the south-facing roof section, an adjacent concrete yard (970 sq.m), attenuation drainage system and landscaping works at the Gairdini facility. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
View the full application file on the council's planning portal →Application Timeline
Application received
5 Apr 2022
Decision due
19 Jun 2023
Decision: REFUSED
19 Jun 2023
Application Details
- Location
- Lackanastooka Ballydesmond Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 5 April 2022
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 19 June 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of access tunnel under roadway at window and door manufacturing facility
LACKANASTOOKA, LACKANASTOOKA,
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road.
Munster Joinery Lacka Cross, Lackanastooka Ballydesmond Co. Cork
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road.
Munster Joinery Lacka Cross Lackanastooka, Ballydesmond Co. Cork
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road. Total floor area of 3868sq.m
Munster Joinery Lacka Cross, Lackanastooka Ballydesmond Co. Cork
2 no. wind turbines (80m hub height and 80m blade diameter) with overall height not exceeding 125m high, 2 no. transformers, site track and associated works
Lackanastooka Ballydesmond
Construct a 1,524sq.m dispatch yard storage building for the storage of finished products of windows and doors. Permission is also sought to replace the existing north facing dispatch yard blockwork boundary wall with a concrete panel and blockwork pillar type construction together with all ancillary services and associated site works
Lackanastooka Ballydesmond Co. Cork
Construction of four storey office building comprising of reception, offices, file storage room and toilets on ground floor, canteen and toilets on first floor, open plan offices, storage room and toilets on second floor and open plan offices and file storage rooms on third floor
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Retention of an access road, associated retaining walls with a total area of 840sq.m and all associated site and ancillary works.
Lacka Cross Lackanastooka Ballydesmond Co. Cork
Retention for works for PVC processing building consisting of (i). Extension of retaining wall in front of PVC processing building phase 2 (ii.) Enlargement of roller shutter door on north elevation of the PVC processing building phase 2 (iii.) Ancillary works for revised access to building, including access road. All works relate to the existing PVC processing building.
Munster Joinery Lacka Cross, Lackanastooka Ballydesmond Co. Cork
Retention for works for PVC processing building consisting of (i) Extension of retaining wall in front of PVC Processing Building Phase 2 (ii) Enlargement of roller shutter door on north elevation of the PVC Processing building Phase 2 (iii) Ancillary Works for revised access to building, including access road. All works relate to the existing PVC Processing Building
Munster Joinery Lacka Cross Lackanastooka Ballydesmond Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?