Proposed Development
Demolish existing cottage and construct new two storey dwelling, detached domestic garage/store building, proprietary wastewater treatment system and percolation area, new vehicular entrance from the public road and all ancillary site development works.
Application Timeline
Application received
27 Jan 2023
Decision: CONDITIONAL
28 Oct 2023
Decision due
31 Oct 2023
Grant issued
1 Dec 2023
Application Details
- Location
- Brinny Innishannon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 27 January 2023Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 October 2023
- Grant Date
- 1 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to construct 20 no. electric vehicle charging bays within an existing private car park, including the installation of associated charging infrastructure, a single-storey electrical kiosk, relocation of one existing light standard, and all associated ancillary site works. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive License issued by the Environmental Protection Agency (EPA).
Brinny, Innishannon, Co. Cork
A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution permission and control license.
Brinny Innishannon Co. Cork Co. Cork
The addition of a zinc box internally illuminated wind breaker with MSD logo to the entrance area of building 21 and associated site works along with the installation of a 2.43 metre high fence to the north site boundary of the building to tie into existing site fencing. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Works to existing Building 22 fermentation building previous Pl. Reg. No. S/93/0464: (A) Elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associated paths and landscaping, (B) Retention of the existing extension to the south east corner of the building on the ground and first floors
Brinny Innishannon Co. Cork
A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Construction of combined heat and power plant (CHP) comprising of 8m high single storey building to house boiler equipment, gas tubine enclosed in an acoustic unit located adjacent to the building, a water tank with max. height of 7m, a pipe rack from the new CHP plant to the existing boilerhouse, a 15m high stack, 1.2m in diameter, 7m of which will be visible above the boiler building ridge level
Brinny Innishannon
Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Permission for (A) Single storey extension to existing laboratory building (Building 22) with external mechanical plant platform (above roof of extension). (B) Elevational modifications to building 22 and associated site works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
Brinny, Innishannon, Co. Cork, T12 RD82
A Combined Heat & Power Plant comprising of an 8m high 178sqm single storey building to house the boiler equipment, a gas turbine enclosed in an acoustic unit located adjacent to the building, a water tank with a max height of 7m, a piperack from the new CHP plant to the existing boilerhouse, a 15m high stack 1.2m in diameter, 7m of which will be visible above the boiler building ridge level
Brinny
The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)
Brinny Innishannon Co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?