Brinny, Innishannon, Co. Cork
Grant with ConditionsPlanning application 26/0422
Cork - Cork County Council
Proposed Development
Permission to construct 20 no. electric vehicle charging bays within an existing private car park, including the installation of associated charging infrastructure, a single-storey electrical kiosk, relocation of one existing light standard, and all associated ancillary site works. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive License issued by the Environmental Protection Agency (EPA).
Application Timeline
Application received
20 Feb 2026
Decision: Grant with Conditions
15 Apr 2026
Decision due
16 Apr 2026
Grant issued
20 May 2026
Application Details
- Location
- Brinny, Innishannon, Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 February 2026Other applications received that week
- Status
- Application Closed
- Decision
- Grant with Conditions
- Decision Date
- 15 April 2026
- Grant Date
- 20 May 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The addition of a zinc box internally illuminated wind breaker with MSD logo to the entrance area of building 21 and associated site works along with the installation of a 2.43 metre high fence to the north site boundary of the building to tie into existing site fencing. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Single storey equipment store room extension, a roof access stairs, (floor area of 166sqm) associated site works and the addition of new fire escape doors all to the existing OPS 2 building.
Brinny Innishannon Co.Cork
A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.
Brinny Innishannon
A single storey extension to the rear of the OPS 2 building to house a product line conveyor, (floor area of 41.7m²) and associated site works
Brinny Innishannon Co Cork
A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution permission and control license.
Brinny Innishannon Co. Cork Co. Cork
The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)
Brinny Innishannon Co.Cork
Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m
Brinny Innishannon Co. Cork
Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m.