WITHIN THE TOWNLANDS OF LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN LEA BEG AND , LEA MORE , CO. OFFALY

REFUSED

Planning application 2320

Offaly - Offaly County Council

Proposed Development

DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE PROPOSED SOLAR PV ENERGY DEVELOPMENT IS CONTAINED WITHIN TWO DISTINCT PARCELS OF LAND, REFERRED TO AS ZONE 1 AND ZONE 2. THE OVERALL DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L70099, L70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Jan 2023

  2. Decision due

    22 Mar 2023

  3. Decision: REFUSED

    22 Mar 2023

  4. Appeal submitted

    17 Apr 2023

  5. Appeal decided: CONDITIONAL

    19 Apr 2024

Application Details

Location
WITHIN THE TOWNLANDS OF LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN LEA BEG AND , LEA MORE , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
247 ha

Timeline

Registration Date
26 January 2023
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
22 March 2023
Permission Expires
18 April 2034

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-316303-23.
Decision
CONDITIONAL
Submitted
17 April 2023
Decided
19 April 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

9m
231N/A4 Jan 2023

DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L.70099, L.70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L.70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION

LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN , LEA BEG AND LEA MORE , CO. OFFALY

1.3km
2460326REFUSED28 Aug 2024

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

Rin , Ferbane , County Offaly

1.3km
2460325N/A23 Aug 2024

Lea Mór Renewable Energy Community (REC) Limited,intend to apply for permission for development at this site at Rin, Co. Offaly. The development will consist of: • The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. • Installation of the hardstanding area for the Wind Energy Converter. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

Rin , Ferbane , County Offaly

1.3km
2460276N/A23 Jul 2024

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

Rin , Ferbane , County Offaly

1.3km
2460288N/A29 Jul 2024

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan

Rin , Ferbane , County Offaly

1.4km
21306REFUSED17 May 2021

CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS

RIN , CO. OFFALY

1.6km
2560531REFUSED31 Oct 2025

construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.

Leabeg , Boora Blueball , Co. Offaly

1.6km
22610CONDITIONAL25 Nov 2022

A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS

LEABEG BLUEBALL , CO. OFFALY , R35 FX79

1.7km
23366N/A22 Aug 2023

BUILDING NEW DWELLING HOUSE, INSTALL EFFLUENT TREATMENT SYSTEM WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS

LEABEG , BOORA , CO.OFFALY

1.9km
2460279CONDITIONAL23 Jul 2024

Two organic growing polytunnel units, rainwater harvesting, new entrance and all ancillary works.

Leabeg , Tullamore , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?