Rin , Ferbane , County Offaly

REFUSED

Planning application 2460326

Offaly - Offaly County Council

Proposed Development

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Aug 2024

  2. Decision due

    22 Oct 2024

  3. Decision: REFUSED

    22 Oct 2024

  4. Appeal submitted

    13 Nov 2024

  5. Appeal decided: CONDITIONAL

    23 May 2025

Application Details

Location
Rin , Ferbane , County Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
4.31 ha

Timeline

Registration Date
28 August 2024
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
22 October 2024
Permission Expires
22 May 2030

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-321244-24
Decision
CONDITIONAL
Submitted
13 November 2024
Decided
23 May 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2460325N/A23 Aug 2024

Lea Mór Renewable Energy Community (REC) Limited,intend to apply for permission for development at this site at Rin, Co. Offaly. The development will consist of: • The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. • Installation of the hardstanding area for the Wind Energy Converter. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

Rin , Ferbane , County Offaly

2m
2460276N/A23 Jul 2024

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.

Rin , Ferbane , County Offaly

2m
2460288N/A29 Jul 2024

•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan

Rin , Ferbane , County Offaly

39m
21306REFUSED17 May 2021

CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS

RIN , CO. OFFALY

1.3km
2320REFUSED26 Jan 2023

DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE PROPOSED SOLAR PV ENERGY DEVELOPMENT IS CONTAINED WITHIN TWO DISTINCT PARCELS OF LAND, REFERRED TO AS ZONE 1 AND ZONE 2. THE OVERALL DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L70099, L70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION

WITHIN THE TOWNLANDS OF LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN LEA BEG AND , LEA MORE , CO. OFFALY

1.3km
23291CONDITIONAL19 Jun 2023

RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C.5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10-15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MONA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPICATION

LOUGH BOORA DISCOVERY PARK , LEABEG , BOORA TULLAMORE CO. OFFALY

1.4km
231N/A4 Jan 2023

DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L.70099, L.70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L.70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION

LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN , LEA BEG AND LEA MORE , CO. OFFALY

1.4km
23256N/A2 Jun 2023

A RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C. 5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10 - 15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MÓNA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPLICATION

LOUGH BOORA DISCOVERY PARK BOORA TULLAMORE , CO. OFFALY , R35 R220

1.4km
22610CONDITIONAL25 Nov 2022

A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS

LEABEG BLUEBALL , CO. OFFALY , R35 FX79

1.5km
2560531REFUSED31 Oct 2025

construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.

Leabeg , Boora Blueball , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?