Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly
CONDITIONALPlanning application 2460250
Offaly - Offaly County Council
Proposed Development
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Application Timeline
Application received
3 Jul 2024
Further information requested
28 Aug 2024
Further information received
12 Sept 2024
Decision: CONDITIONAL
13 Nov 2024
Decision due
14 Nov 2024
Grant issued
18 Dec 2024
Application Details
- Location
- Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 3.9 ha
Timeline
- Registration Date
- 3 July 2024Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 November 2024
- Grant Date
- 18 December 2024
- Permission Expires
- 17 December 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence.
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
REPLACEMENT OF THE EXISTING 16M HIGH WOODEN POLE COMMUNICATION STRUCTURE WITH A 24 METRE HIGH FREE STANDING LATTICE COMMUNICATION STRUCTURE, CARRYING ANTENNAE AND COMMUNICATION DISHES WITH ASSOCIATED GROUND-MOUNTED EQUIPMENT. EXTENSION OF THE EXISTING COMMUNICATION COMPOUND TO ACCOMMODATE THE REPLACEMENT STRUCTURE WITH 2.4 METRE HIGH PALISADE FENCING TO MATCH THE EXISTING
ESB CLONMINCH 38KV SUBSTATION , TOWNLAND OF CLONMINCH TULLAMORE , CO OFFALY
CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (441.5m2) INTO A VISITOR CENTRE WITH SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON EXISTING 50.50 HA SITE OF THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE
TULLAMORE DISTILLERY , BALLARD & CLONMINCH , CO. OFFALY
CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (552.19 M2) INTO A VISITOR CENTRE WITH ANCILLARY SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING NEW TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON 0.0846 HA SITE LOCATED WITHIN THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE
TULLAMORE DISTILLERY CAMPUS , BALLARD & CLONMINCH , CO.OFFALY
THREE NO. TWO STOREY HOUSES, ALL ANCILLARY SERVICES AND WORKS
CLONMINCH LANE CLONMINCH , TULLAMORE , CO. OFFALY
ON THE GRANT OF OUTLINE PERMISSION REF. NO. PL2/20/326 FOR THE DEVELOPMENT OF TWO NO. TWO STOREY HOUSES, ALL ANCILLARY SERVICES AND WORKS
CLONMINCH LANE , CLONMINCH , TULLAMORE CO. OFFALY
STRUCTURE AS BUILT TO DATE, AND PERMISSION FOR COMPLETION INCULDING CONVERSION OF SAME TO A FOUR- BEDROOM DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKS
THE MEWS VIOLET COTTAGE , CLONMINCH ROAD TULLAMORE , CO OFFALY
STRUCTURE AS BUILT TO DATE, AND PERMISSION FOR COMPLETION INCLUDING CONVERSION OF SAME TO A FOUR-BEDROOM DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKS
THE MEWS TO THE REAR OF VOILET COTTAGECLONMINCH ROAD , TULLAMORE , CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?