Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

Request Additional Information

Planning application SD19A/0267

Dublin - South Dublin County Council

Proposed Development

Construction of ESB substation.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Aug 2019

  2. Decision due

    16 Sept 2019

  3. Further information requested

    10 Oct 2019

  4. Decision: Request Additional Information

    10 Oct 2019

Application Details

Location
Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
7500 ha
Floor Area
14 sq m

Timeline

Registration Date
20 August 2019
Status
Decision
Decision
Request Additional Information
Decision Date
10 October 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
ED15/0028Declared Not Exempt18 Aug 2015

Whether the subdivision of Unit No. 16 into two separate units is development and whether it is, or is not, exempted development, & whether a material change in use of part of Unit 16 has occurred where it is used by McMahon Builders Providers.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

82m
SD10A/0243Granted17 Aug 2010

Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

87m
S01A/0092Granted12 Feb 2001

Installation of 30m Antennae support structure carrying high frequency point to point radio equipment and GSM telecommunications antennae, associated equipment and 2.4m high palisade fencing

Interchem Ltd., Unit 29 Cherry Orchard Industrial Estate, Dublin 10.

89m
SD05A/0639Granted28 Jul 2005

The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

90m
SD11A/0025Grant Permission for Retention2 Feb 2011

Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

90m
SD21A/0075Grant Permission for Retention29 Mar 2021

Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

92m
ED09/0019Declared Exempt16 Jul 2009

1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.

16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

95m
SD16A/0272Grant Permission for Retention29 Jul 2016

Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works

Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10

104m
SD25A/0309WGranted17 Dec 2025

Proposed erection of a 233.57 sq.m. Single storey single bay extension with 9 daylight panels integrated into pitched roof for light industrial use, to the rear of the existing unit 28a Cherryorchard industrial estate

UNIT 28A, CHERRYORCHARD INDUSTRIAL ESTATE, BALLYFERMOT, DUBLIN 10, D10 XF44

104m
SD25A/0155WInvalid - Site Notice27 Jun 2025

Proposed erection of a 233.57sq.m single storey single bay extension with 9 daylight panels integrated into pitched roof of existing unit.

Unit 28a, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10, D10XF44

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?