Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
Request Additional InformationPlanning application SD19A/0267
Dublin - South Dublin County Council
Proposed Development
Construction of ESB substation.
View the full application file on the council's planning portal →Application Timeline
Application received
20 Aug 2019
Decision due
16 Sept 2019
Further information requested
10 Oct 2019
Decision: Request Additional Information
10 Oct 2019
Application Details
- Location
- Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 7500 ha
- Floor Area
- 14 sq m
Timeline
- Registration Date
- 20 August 2019
- Status
- Decision
- Decision
- Request Additional Information
- Decision Date
- 10 October 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Whether the subdivision of Unit No. 16 into two separate units is development and whether it is, or is not, exempted development, & whether a material change in use of part of Unit 16 has occurred where it is used by McMahon Builders Providers.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Installation of 30m Antennae support structure carrying high frequency point to point radio equipment and GSM telecommunications antennae, associated equipment and 2.4m high palisade fencing
Interchem Ltd., Unit 29 Cherry Orchard Industrial Estate, Dublin 10.
The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.
16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works
Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10
Proposed erection of a 233.57 sq.m. Single storey single bay extension with 9 daylight panels integrated into pitched roof for light industrial use, to the rear of the existing unit 28a Cherryorchard industrial estate
UNIT 28A, CHERRYORCHARD INDUSTRIAL ESTATE, BALLYFERMOT, DUBLIN 10, D10 XF44
Proposed erection of a 233.57sq.m single storey single bay extension with 9 daylight panels integrated into pitched roof of existing unit.
Unit 28a, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10, D10XF44
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?