← Back to search

Wallers Lot , Cashel , Co Tipperary

CONDITIONAL

Planning application 18600320

Tipperary - Tipperary County Council

Proposed Development

the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Mar 2018

  2. Further information requested

    4 May 2018

  3. Further information received

    25 Jul 2018

  4. Decision: CONDITIONAL

    20 Aug 2018

  5. Decision due

    21 Aug 2018

  6. Grant issued

    24 Sept 2018

Application Details

Location
Wallers Lot , Cashel , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
2.003 ha

Timeline

Registration Date
15 March 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 August 2018
Grant Date
24 September 2018
Permission Expires
23 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
18600239N/A27 Feb 2018

the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway

Wallers Lot , Cashel , Co Tipperary

40m
19600597CONDITIONAL31 May 2019

development consisting of the (I) demolition of existing substation, and (ii) construction of a new substation (iii) all associated site and development works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel

50m
2460099CONDITIONAL14 Feb 2024

(i) modifications to the existing internal floor layout at ground floor level, totaling 35sqm in area, to incorporate a new food offer, (ii) the creation of new staff room at first floor level (iii) new internally illuminated signage on the northeast and northwest elevations and (iv) all other associated site development works

Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary

50m
2360316CONDITIONAL12 May 2023

a change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 12.5sqm and is ancillary to the primary retail use

Circle K Cashel Service Station , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary

55m
19600536N/A17 May 2019

the development will consist of (i) Demolition of existing substation, and (ii) Construction of a new substation, and (iii) all associated site works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Wallers Lot Cashel

56m
18601043CONDITIONAL24 Aug 2018

a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works

Circle K Motorway Service Area , Junction 8 M8 Motorway , Wallers Lot Cashel

58m
18600952N/A30 Jul 2018

a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel

61m
19601030N/A18 Sept 2019

development consisting of the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area

Junction 8 of the M8 Motorway , Wallers Lot , Cashel

67m
19601073N/A27 Sept 2019

the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area

Junction 8 of the M8 Motorway , Wallers Lot , Cashel

150m
20790CONDITIONAL20 Jul 2020

development will consist of the replacement of an existing 24 metre lattice tower and existing 21 metre wooden pole for a 30 metre high free standing lattice communications structure carrying antennae and communication dishes, with associated equipment to form part of ESB's communication system and to share with other licensed operators within an existing compound

Cashel ESB Station , Waller's Lot , Cashel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?