← Back to search

Cashel ESB Station , Waller's Lot , Cashel

CONDITIONAL

Planning application 20790

Tipperary - Tipperary County Council

Proposed Development

development will consist of the replacement of an existing 24 metre lattice tower and existing 21 metre wooden pole for a 30 metre high free standing lattice communications structure carrying antennae and communication dishes, with associated equipment to form part of ESB's communication system and to share with other licensed operators within an existing compound

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jul 2020

  2. Decision: CONDITIONAL

    10 Sept 2020

  3. Decision due

    13 Sept 2020

  4. Grant issued

    14 Oct 2020

Application Details

Location
Cashel ESB Station , Waller's Lot , Cashel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
20 July 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 September 2020
Grant Date
14 October 2020
Permission Expires
13 October 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

101m
2460099CONDITIONAL14 Feb 2024

(i) modifications to the existing internal floor layout at ground floor level, totaling 35sqm in area, to incorporate a new food offer, (ii) the creation of new staff room at first floor level (iii) new internally illuminated signage on the northeast and northwest elevations and (iv) all other associated site development works

Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary

101m
2360316CONDITIONAL12 May 2023

a change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 12.5sqm and is ancillary to the primary retail use

Circle K Cashel Service Station , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary

150m
18600320CONDITIONAL15 Mar 2018

the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway

Wallers Lot , Cashel , Co Tipperary

152m
18600239N/A27 Feb 2018

the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway

Wallers Lot , Cashel , Co Tipperary

156m
19601030N/A18 Sept 2019

development consisting of the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area

Junction 8 of the M8 Motorway , Wallers Lot , Cashel

158m
19601073N/A27 Sept 2019

the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area

Junction 8 of the M8 Motorway , Wallers Lot , Cashel

176m
19600597CONDITIONAL31 May 2019

development consisting of the (I) demolition of existing substation, and (ii) construction of a new substation (iii) all associated site and development works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel

181m
18601043CONDITIONAL24 Aug 2018

a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works

Circle K Motorway Service Area , Junction 8 M8 Motorway , Wallers Lot Cashel

187m
18600952N/A30 Jul 2018

a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel

191m
19600536N/A17 May 2019

the development will consist of (i) Demolition of existing substation, and (ii) Construction of a new substation, and (iii) all associated site works

Circle K Motorway Services Area , Junction 8 M8 Motorway , Wallers Lot Cashel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?