Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
CONDITIONALPlanning application 2460099
Tipperary - Tipperary County Council
Proposed Development
(i) modifications to the existing internal floor layout at ground floor level, totaling 35sqm in area, to incorporate a new food offer, (ii) the creation of new staff room at first floor level (iii) new internally illuminated signage on the northeast and northwest elevations and (iv) all other associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
14 Feb 2024
Decision due
9 Apr 2024
Decision: CONDITIONAL
9 Apr 2024
Grant issued
13 May 2024
Application Details
- Location
- Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.041 ha
Timeline
- Registration Date
- 14 February 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 April 2024
- Grant Date
- 13 May 2024
- Permission Expires
- 12 May 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 12.5sqm and is ancillary to the primary retail use
Circle K Cashel Service Station , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway
Wallers Lot , Cashel , Co Tipperary
the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway
Wallers Lot , Cashel , Co Tipperary
development consisting of the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
development consisting of the (I) demolition of existing substation, and (ii) construction of a new substation (iii) all associated site and development works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
Circle K Motorway Service Area , Junction 8 M8 Motorway , Wallers Lot Cashel
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
the development will consist of (i) Demolition of existing substation, and (ii) Construction of a new substation, and (iii) all associated site works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Wallers Lot Cashel
development will consist of the replacement of an existing 24 metre lattice tower and existing 21 metre wooden pole for a 30 metre high free standing lattice communications structure carrying antennae and communication dishes, with associated equipment to form part of ESB's communication system and to share with other licensed operators within an existing compound
Cashel ESB Station , Waller's Lot , Cashel
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?