← Back to search

Brinny Innishannon Co.Cork

CONDITIONAL

Planning application 17/4830

Cork - Cork County Council

Proposed Development

The development will consist of a Biopharmaceutical Manufacturing Facility and associated works; • The alterations and extensions to permitted pharmaceutical production building, Building 21 for pharmaceutical vaccine production use, located to the north east of the MSD site. The works include a new first floor, internal works, the alteration of all elevations including raising the parapet by 0.5 meters, the construction of a new 2 storey extension to the west elevation containing stairs and lift and the construction of a new two storey electrical and lift extension to the east elevation and the provision of roof mounted plant within the curtilage of the new raised parapet and an enclosed services shaft. The existing permitted Building 21 is 3,751 square meters and 15.2 meters high. Modifications include raising of the parapet by 0.5m and the addition of the East 2 storey electrical extension sized 190 square meters and 15.7 meters high. The West Staircase and Lift shaft is sized 31 square meters and to a height of 15.7m. The East lift shaft is sized 16 square meters and 17.1m high. The South Service shaft is 12 square meters and 15.7m high. • Permission for a temporary contractors compound to facilitate the construction work and commissioning of Building 21, consisting of a single storey administration building, a single storey canteen facility, 20 no. modular (container based) offices, 2 no. toilet blocks and 26 no. modular (container based) storage units for construction related materials. • The works include car parking for an additional 320 new permanent car spaces in an extension and alteration to the existing main car park using an existing widened road entrance. • The relocation of a permanent contractor compound to a new location to the south west of the MSD site. This site is to be laid out with two storey and single storey modular construction facilities including 25 no. single storey modular (container based) workshops, 4 no. modular (container based) storage units for construction related materials, 1 no. two storey modular office building, a single storey toilet building, a single storey canteen building, 2 no. single storey workshops, and a single storey security building. The site area is to be fully landscaped, and consists of an area sized 5,106 square meters in total. • The works also include landscaping, a surface water attenuation area, local landscaped berms, minor alterations to existing entrances, alterations and ext

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Apr 2017

  2. Decision: CONDITIONAL

    30 May 2017

  3. Decision due

    31 May 2017

  4. Grant issued

    5 Jul 2017

Application Details

Location
Brinny Innishannon Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 April 2017Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 May 2017
Grant Date
5 July 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

65m
21/7034CONDITIONAL10 Nov 2021

The addition of a zinc box internally illuminated wind breaker with MSD logo to the entrance area of building 21 and associated site works along with the installation of a 2.43 metre high fence to the north site boundary of the building to tie into existing site fencing. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency Act 1992 (as amended) is required.

Brinny Innishannon Co. Cork

66m
26/0422Grant with Conditions20 Feb 2026

Permission to construct 20 no. electric vehicle charging bays within an existing private car park, including the installation of associated charging infrastructure, a single-storey electrical kiosk, relocation of one existing light standard, and all associated ancillary site works. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive License issued by the Environmental Protection Agency (EPA).

Brinny, Innishannon, Co. Cork

102m
11/4339CONDITIONAL22 Feb 2011

(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.

Brinny Innishannon

104m
13/4647CONDITIONAL11 Apr 2013

Single storey equipment store room extension, a roof access stairs, (floor area of 166sqm) associated site works and the addition of new fire escape doors all to the existing OPS 2 building.

Brinny Innishannon Co.Cork

112m
21/4848CONDITIONAL6 Apr 2021

A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.

Brinny Innishannon Co. Cork

118m
14/6119CONDITIONAL2 Oct 2014

A single storey extension to the rear of the OPS 2 building to house a product line conveyor, (floor area of 41.7m²) and associated site works

Brinny Innishannon Co Cork

172m
11/6681INCOMPLETED APPLICATION22 Dec 2011

Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m

Brinny Innishannon Co. Cork

172m
12/4032CONDITIONAL12 Jan 2012

Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m.

Brinny Innishannon Co. Cork

180m
17/5507INCOMPLETED APPLICATION15 Jun 2017

A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution permission and control license.

Brinny Innishannon Co. Cork Co. Cork

180m
22/4275CONDITIONAL11 Feb 2022

The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)

Brinny Innishannon Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?