← Back to search

Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh

CONDITIONAL

Planning application 19600008

Tipperary - Tipperary County Council

Proposed Development

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Jan 2019

  2. Further information requested

    26 Feb 2019

  3. Further information received

    11 Jul 2019

  4. Decision: CONDITIONAL

    18 Sept 2019

  5. Decision due

    19 Sept 2019

  6. Grant issued

    23 Oct 2019

Application Details

Location
Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.16 ha
Floor Area
2683.1000000000013 sq m
Residential Units
24

Timeline

Registration Date
4 January 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 September 2019
Grant Date
23 October 2019
Permission Expires
22 October 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24152REFUSED8 Jul 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

0m
24267UNCONDITIONAL20 Nov 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

0m
25218UNCONDITIONAL23 Oct 2025

construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

33m
201263N/A29 Oct 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

35m
201308CONDITIONAL6 Nov 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

49m
2561333N/A19 Dec 2025

1) ground mounted solar PV panels with new fence enclosure and access gates, 2) a switchgear container, 3) 6 No. electric vehicle charging points and associated site works

Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

54m
2460449CONDITIONAL6 Jun 2024

(1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site works

Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

59m
2460075N/A7 Feb 2024

(1). Solar PV panels to the existing hotel roof (2). Two new wind turbines, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

67m
18601532N/A21 Dec 2018

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 12 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Tyone , Nenagh North & Nenagh South , Dublin Road

83m
2460078N/A8 Feb 2024

1. Solar PV panels to the existing hotel roof 2. Two new wind turbines, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works

Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?