Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
N/APlanning application 201263
Tipperary - Tipperary County Council
Proposed Development
material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 29 October 2020
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
(1). Solar PV panels to the existing hotel roof (2). Two new wind turbines, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works
Nenagh North and Tyone , Abbeycourt Hotel Dublin Road , Nenagh
new solar panels to the existing roof of each of the 14 existing houses, numbers 1 to 12 and 14 to 15 inclusive, and all associated site works
Tyone , adjacent to Abbeycourt Hotel , Dublin Road Nenagh
1) ground mounted solar PV panels with new fence enclosure and access gates, 2) a switchgear container, 3) 6 No. electric vehicle charging points and associated site works
Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh
(1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site works
Nenagh North Nenagh South and Tyone , Abbeycourt Hotel Dublin Road , Nenagh
solar panels to roof of rear elevations of 14 existing private dwellings and all associated site works
Tyone , Dublin Road , Nenagh Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?