Tyone , Dublin Road , Nenagh Co. Tipperary
N/APlanning application 21108
Tipperary - Tipperary County Council
Proposed Development
solar panels to roof of rear elevations of 14 existing private dwellings and all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Tyone , Dublin Road , Nenagh Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.102 ha
Timeline
- Registration Date
- 2 February 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
new solar panels to the existing roof of each of the 14 existing houses, numbers 1 to 12 and 14 to 15 inclusive, and all associated site works
Tyone , adjacent to Abbeycourt Hotel , Dublin Road Nenagh
the subdivision of two existing three-storey residential units (previous planning reference 20259) to 2 no. two bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor level, hard and soft landscaping, external lighting and associated site works
Nenagh North and Nenagh South , adjacent to the Abbey Court Hotel , Dublin Road Nenagh Co. Tipperary
material change of use of 14 existing three-storey holiday homes to private dwellings, the construction of new metal railings to enclose front gardens, hard and soft landscaping, external lighting and associated site works, adjacent to Abbey Court Hotel
Nenagh North and Nenagh South , Dublin Road , Nenagh Co. Tipperary
the division and alteration of two existing three-storey houses to form two no. two-bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor levels, (four units in total) including access stairs from the ground floor, proposed alterations of rear elevations to include forming new door openings and closing other existing opes, proposed subdivision of existing rear gardens, proposed access road and car-parking spaces, new boundary walls with gates, hard and soft landscaping, external lighting and associated site works
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works
Castleway , Dublin Road , Nenagh
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?