← Back to search

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

CONDITIONAL

Planning application 201262

Tipperary - Tipperary County Council

Proposed Development

the division and alteration of two existing three-storey houses to form two no. two-bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor levels, (four units in total) including access stairs from the ground floor, proposed alterations of rear elevations to include forming new door openings and closing other existing opes, proposed subdivision of existing rear gardens, proposed access road and car-parking spaces, new boundary walls with gates, hard and soft landscaping, external lighting and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Oct 2020

  2. Decision: CONDITIONAL

    18 Dec 2020

  3. Decision due

    23 Dec 2020

  4. Grant issued

    30 Jan 2021

Application Details

Location
Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.123 ha
Floor Area
477.8 sq m
Residential Units
1

Timeline

Registration Date
29 October 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 December 2020
Grant Date
30 January 2021
Permission Expires
29 January 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
201173N/A12 Oct 2020

the subdivision of two existing three-storey residential units (previous planning reference 20259) to 2 no. two bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor level, hard and soft landscaping, external lighting and associated site works

Nenagh North and Nenagh South , adjacent to the Abbey Court Hotel , Dublin Road Nenagh Co. Tipperary

33m
21108N/A2 Feb 2021

solar panels to roof of rear elevations of 14 existing private dwellings and all associated site works

Tyone , Dublin Road , Nenagh Co. Tipperary

37m
20259CONDITIONAL16 Mar 2020

material change of use of 14 existing three-storey holiday homes to private dwellings, the construction of new metal railings to enclose front gardens, hard and soft landscaping, external lighting and associated site works, adjacent to Abbey Court Hotel

Nenagh North and Nenagh South , Dublin Road , Nenagh Co. Tipperary

43m
21222CONDITIONAL24 Feb 2021

new solar panels to the existing roof of each of the 14 existing houses, numbers 1 to 12 and 14 to 15 inclusive, and all associated site works

Tyone , adjacent to Abbeycourt Hotel , Dublin Road Nenagh

113m
201308CONDITIONAL6 Nov 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

116m
201263N/A29 Oct 2020

material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works

Tyone adjacent to the Abbey Court Hotel , Dublin Road , Nenagh Co. Tipperary

133m
2360077CONDITIONAL6 Feb 2023

(1) marque with base for the purpose of function / reception area, (2) canopy over external dining space

Abbey Court Hotel , Dublin Road Nenagh , Co Tipperary (Nenagh North / Tyone TLD)

145m
19600008CONDITIONAL4 Jan 2019

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Tyone , Nenagh North & Nenagh South , Dublin Road Nenagh

145m
24152REFUSED8 Jul 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

145m
24267UNCONDITIONAL20 Nov 2024

the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works

Castleway , Dublin Road , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?